ENGINEERING SOLUTIONS

HCR SEGMENT LIFTERS POWER BALANCED CANTILEVER CONSTRUCTION ON US BONNER BRIDGE

003 (1).jpg

In the construction of the US Bonner Bridge, HCR's specialized segment lifters enabled precise balanced cantilever erection. Each cantilever comprises 26 precast segments, with the lifters anchored to previously erected segments via post-tensioning bars for millimeter-level control.

003 (2).jpg

Technical Superiority
▶ Self-Anchoring System: Lifters form load-bearing chain with installed segments
▶ Synchronized Progress: 26-segment sequence ensures dual-cantilever balance
▶ Global Compliance: Equipment meets AASHTO construction standards

003 (3).jpg

Structural Symphony
As the final segment locked over Pamlico Sound, this cantilevered marvel - powered by HCR technology - redefined coastal infrastructure.


CONTACT US

Contact: Ren Binqing

Phone: +86 310 4022830

E-mail: renbinqing@vip.163.com;mark@hcrbridge.com

Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA