ENGINEERING SOLUTIONS

HCR'S JACKING SYSTEM REVOLUTIONIZES 121-YEAR-OLD BRIDGE REPLACEMENT ON QINGDAO-JINAN HIGH-SPEED RAILWAY

241003.jpg

At 10:00 a.m. on November 7, a critical milestone was achieved in the steel girder replacement project for the 121-year-old Coastal Road Bridge on the Qingdao-Jinan High-Speed Railway. The first steel girder was successfully jacked up and transversely shifted using HCR’s proprietary technology, marking the project’s breakthrough phase.

241002.jpg

Project Significance

  • Location: Sole bullet train passage between Qingdao Station and Qingdao North Station

  • Historic value: Built in 1901 – Shandong’s longest-serving railway steel bridge

  • Critical need: Four aging girders posed safety risks requiring urgent replacement

241001.jpgFacing extreme constraints – including zero space for large equipment, slippery surfaces, dense cabling, and structural aging – HCR delivered an innovative solution:

  • Deployed modular jacking & transverse shifting equipment (self-developed)

  • Enabled millimeter-precision maneuvering in confined spaces

  • Eliminated disruption to active rail lines and under-bridge traffic

"Our solution prioritized safety, economy, and operability," stated HCR’s engineering team. "This sets a new standard for heritage infrastructure rehabilitation."

With 70 years of specialized experience, HCR continues to pioneer integrated solutions that merge technical innovation with practical reliability.

CONTACT US

Contact: Ren Binqing

Phone: +86 310 4022830

E-mail: renbinqing@vip.163.com;mark@hcrbridge.com

Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA