INDUSTRY LEADERSHIP

HCR'S 8 ERECTORS LIFT 120-TON SEGMENTS FOR YANGON'S INDUSTRIAL LIFELINE

241202.jpg

Rising 125m beside the congested existing bridge, the new $289 million cable-stayed crossing over the Bago River is transforming connectivity between Thanlyin and Thaketa Township. HCR supplied 8 specialized segment erectors to handle 1,928m of 120-ton concrete segments – critical for accommodating heavy trucks from Yangon’s industrial zones.

241206.jpg

Project Impact:

  • 2x Traffic Flow: Dual 2-lane carriageways vs. single-lane bottleneck

  • Industrial Priority: Designed for 100-ton truck loads (existing bridge: 40-ton limit)

  • 2023 Completion: On track to cut peak delays by 70%

  • 241204.jpg

CONTACT US

Contact: Ren Binqing

Phone: +86 310 4022830

E-mail: renbinqing@vip.163.com;mark@hcrbridge.com

Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA