Rising 125m beside the congested existing bridge, the new $289 million cable-stayed crossing over the Bago River is transforming connectivity between Thanlyin and Thaketa Township. HCR supplied 8 specialized segment erectors to handle 1,928m of 120-ton concrete segments – critical for accommodating heavy trucks from Yangon’s industrial zones.
Project Impact:
▶2x Traffic Flow: Dual 2-lane carriageways vs. single-lane bottleneck
▶Industrial Priority: Designed for 100-ton truck loads (existing bridge: 40-ton limit)
▶2023 Completion: On track to cut peak delays by 70%
Contact: Ren Binqing
Phone: +86 310 4022830
E-mail: renbinqing@vip.163.com;mark@hcrbridge.com
Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA