Congratulations to our engineering team! The DJ220 Beam Erector has achieved remarkable milestones in the ongoing steel bridge project, demonstrating exceptional adaptability in extreme construction environments.
Performance Validation:
▶ Extreme Gradient Handling: Successfully operates on 6.9% longitudinal slopes
▶ Tight Curve Adaptation: Maintains precision in 300m radius curves
▶ Multi-Girder Versatility: Installs U-type, I-type & box girders (50-1100t)Breakthrough Capabilities:
▶ Narrow-Space Optimization: Functions in 18m-wide work zones
▶ Dynamic Load Management: Seamlessly transitions between light (50t) to heavy (1100t) lifts
This achievement marks significant progress in intelligent bridge construction technology. We remain committed to developing cutting-edge solutions that empower global infrastructure development.
Contact: Ren Binqing
Phone: +86 310 4022830
E-mail: renbinqing@vip.163.com;mark@hcrbridge.com
Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA