ENGINEERING SOLUTIONS

CELEBRATING DJ220'S BREAKTHROUGH IN COMPLEX GIRDER INSTALLATION

250303.jpgCongratulations to our engineering team! The DJ220 Beam Erector has achieved remarkable milestones in the ongoing steel bridge project, demonstrating exceptional adaptability in extreme construction environments.

250302.jpgPerformance Validation:
▶ Extreme Gradient Handling: Successfully operates on 6.9% longitudinal slopes
▶ Tight Curve Adaptation: Maintains precision in 300m radius curves
▶ Multi-Girder Versatility: Installs U-type, I-type & box girders (50-1100t)
250304.jpgBreakthrough Capabilities:
▶ Narrow-Space Optimization: Functions in 18m-wide work zones
▶ Dynamic Load Management: Seamlessly transitions between light (50t) to heavy (1100t) lifts

250306.jpgThis achievement marks significant progress in intelligent bridge construction technology. We remain committed to developing cutting-edge solutions that empower global infrastructure development.

CONTACT US

Contact: Ren Binqing

Phone: +86 310 4022830

E-mail: renbinqing@vip.163.com;mark@hcrbridge.com

Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA