We announce the successful installation of 389 × 40-meter box girders for the TJ-8 standard section of the Shenyang-Baihe High-Speed Railway (Jilin segment), utilizing our integrated heavy-lift system:
DJ1000 Beam Erector
1000T Straddle Carrier
1000T Girder Transporter
Engineering Breakthroughs
▶ Extreme Temperature Operation:
‣ Sustained performance from -30°C (winter) to +35°C (summer)
‣ Implemented thermal management protocols for hydraulic systems▶ Long-Distance Transport:
‣ Achieved 30km maximum transport distance per girder
‣ Optimized logistics reducing transit time by 40% vs. industry average
Strategic Impact
Upon completion in 2025, this rail section will:
✓ Reduce Beijing-Changbai Mountain travel to 4 hours (vs. current 12+ hours)
✓ Boost tourism revenue in Northeast China by ¥3.8B/year (Jilin Provincial Gov. estimate)
Contact: Ren Binqing
Phone: +86 310 4022830
E-mail: renbinqing@vip.163.com;mark@hcrbridge.com
Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA