PRODUCT INNOVATION

TYLC200 GIRDER TRANSPORTER COMPLETES FACTORY TESTING FOR MEXICO PROJECT

The TYLC200 Girder Transporter equipped with an integrated hydraulic support system has completed factory validation for the Mexico project. Key technical advancements include:

250902.jpg

250904.jpg

  1. Integrated Hydraulic Support System

    • Multi-stage telescopic legs enable self-contained girder loading/unloading

    • Eliminates gantry crane dependency in casting yard operations

  2. Operational Process Refinement

    • Centralized control console streamulates transfer sequencing

    • Automated leveling mechanisms maintain stability during loading phases

  3. Adaptive Site Performance

    • Configurable support base accommodates variable yard surfaces

    • Modular design facilitates rapid assembly/disassembly

250906.jpg


250907.jpgThe equipment completed protocol-based verification under simulated tropical conditions, aligning with project-specific operational requirements.

CONTACT US

Contact: Ren Binqing

Phone: +86 310 4022830

E-mail: renbinqing@vip.163.com;mark@hcrbridge.com

Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA