ENGINEERING SOLUTIONS

1100-TON GIRDER ERECTED IN 8.4M HEIGHT LIMIT

20251503.jpgHCR (Heavy Construction Resources) construction team has successfully executed the installation of a 1,100-ton high-speed rail box girder within an 8.4-meter vertical clearance using the DJ1100 Single Box Beam Erector.

20251502.jpgOperating at millimeter-level precision, the DJ1100 demonstrated unparalleled structural strength and control stability during the critical lift. The feat marks a new global standard for confined-space heavy lifting in rail infrastructure.

20251501.jpg


CONTACT US

Contact: Ren Binqing

Phone: +86 310 4022830

E-mail: renbinqing@vip.163.com;mark@hcrbridge.com

Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA